Up The Habitat Condo in Bangkok » The Many Facets » (2007-10-13) Structural work continues Prev Next Slideshow

 Previous image  Next image  Index page
P1000348
P1000353
P1000354
P1000355
P1000359
  P1000361.JPG - This is the master suite area. The old bathroom wall has been removed and holes have been cut for translucent glass sheeting inserts. (The glass will be installed within the next week or two.)  
P1000375
P1000364
P1000371
P1000372
P1000373

  | 8 | This is the master suite area. The old bathroom wall has been removed and holes have been cut for translucent glass sheeting inserts. (The glass will be installed within the next week or two.) | P1000361.JPG | 2007-10-13 11:33:15 Download
Total images: 18 | Help