Up The Habitat Condo in Bangkok » The Many Facets » (2007-08-15) Debris mounts Prev Next Slideshow

 Previous image  Next image  Index page
 
 
 
 
P1000255
  P1000243.JPG - All drop ceiling supports have been removed and piled by the guest area (upper left). Wall tiles and ceiling pieces fill the living room area. Remaining concrete tiles are being loosened.  
P1000256
P1000247
P1000244
P1000253
P1000254

  | 2 | All drop ceiling supports have been removed and piled by the guest area (upper left). Wall tiles and ceiling pieces fill the living room area. Remaining concrete tiles are being loosened. | P1000243.JPG | 2007-08-15 10:03:29 Download
Total images: 10 | Help