The Habitat Condo in Bangkok
»
The Many Facets
»
(2007-08-15) Debris mounts
The crew was not on site this morning but the signs are everywhere.
1
The piles of debris are growing. So demolition has...
P1000255
2007-08-15 10:08:03
2
All drop ceiling supports have been removed and piled by...
P1000243
2007-08-15 10:03:29
3
Removed concrete floor tiles. The floor will be replaced...
P1000256
2007-08-15 10:08:13
4
If the interior is a mess, how can you disregard the...
P1000247
2007-08-15 10:04:52
5
Amazing how a shift of perspective alters one's...
P1000244
2007-08-15 10:04:07
6
The kitchen is stripped bare.
P1000253
2007-08-15 10:07:19
7
The kitchen ceiling. Jon plans to add opaque glass and...
P1000254
2007-08-15 10:07:35
8
The master bath awaits further demolition work. The...
P1000246
2007-08-15 10:04:41
9
The wall tile has been removed in the guest bath/laundry...
P1000250
2007-08-15 10:06:29
10
Guest bath floor.
P1000252
2007-08-15 10:06:46
10
Images | ©
JAlbum
&
Chameleon-wChange
|
Help
Get an email notification
when galleries change.
It's private
powered by
ChangeDetection